The following information is for the standard and actual costs for the Happy Corporation: Standard Costs: Budgeted units of production - 16,000 [80% or normal capacity] Standard labor hours per unit - 4 Standard labor rate - $26 per hour Standard material per unit - 8 lbs. Standard material cost - $12 per pound Standard variable overhead rate - $15 per labor hour Budgeted fixed overhead - $640,000 Fixed overhead rate is based on budgeted labor hours at 80% or normal capacity. Actual Cost: Actual production - 16,500 units Actual material purchased and used - 130,000 pounds Actual total material cost - $1,600,000 Actual labor - 65,000 hours Actual total labor costs - $1,700,000 Actual variable overhead - $1,000,000 Actual fixed overhead - $640,000 Determine: a the direct materials quantity variance, price variance, and total cost variance; b the direct labor time variance, rate variance, and total cost variance; and c the factory overhead volume variance, controllable variance, and total factory overhead cost variance.Note: If following text formulas, do not round interim calculations.

Correct Answer

verifed

verified

a
blured image b Direct labor: ...

View Answer

The variable factory overhead controllable variance is


A) $8,981.75 favorable
B) $7,280.75 unfavorable
C) $8,981.75 unfavorable
D) $7,280.75 favorable

E) B) and C)
F) C) and D)

Correct Answer

verifed

verified

Standard costs are a useful management tool that can be used solely as a statistical device apart from the ledger or they can be incorporated in the accounts.

A) True
B) False

Correct Answer

verifed

verified

Calculate the direct materials quantity variance.


A) $4,512.50 unfavorable
B) $4,512.50 favorable
C) $4,750.00 unfavorable
D) $4,750.00 favorable

E) A) and D)
F) All of the above

Correct Answer

verifed

verified

If the standard to produce a given amount of product is 600 direct labor hours at $15 and the actual was 500 hours at $17, the time variance was $1,700 unfavorable.

A) True
B) False

Correct Answer

verifed

verified

Standards are performance goals used to evaluate and control operations.

A) True
B) False

Correct Answer

verifed

verified

A negative fixed overhead volume variance can be caused due to the following except


A) sales orders at a low level
B) machine breakdowns
C) employee inexperience
D) increase in utility costs

E) B) and C)
F) None of the above

Correct Answer

verifed

verified

The most effective means of presenting standard factory overhead cost variance data is through a factory overhead cost variance report.

A) True
B) False

Correct Answer

verifed

verified

The following information relates to manufacturing overhead for the Chapman Company: Standards: Total fixed factory overhead - $450,000 Estimated production - 25,000 units 100% of normal capacity Overhead rates are based on machine hours Standard hours allowed per unit produced - 2 Fixed overhead rate - $9.00 per machine hour Variable overhead rate - $3.50 per hour Actual: Fixed factory overhead - $450,000 Production - 24,000 units Variable overhead - $170,000 Compute a the fixed factory overhead volume variance, b the variable factory overhead controllable variance, and c the total factory overhead cost variance.

Correct Answer

verifed

verified

Standard costs should always be revised when they differ from actual costs.

A) True
B) False

Correct Answer

verifed

verified

The standard costs and actual costs for direct materials for the manufacture of 3,000 actual units of product are The standard costs and actual costs for direct materials for the manufacture of 3,000 actual units of product are   The amount of direct materials price variance is A) $2,750 unfavorable variance B) $2,750 favorable variance C) $1,500 favorable variance D) $1,500 unfavorable variance The amount of direct materials price variance is


A) $2,750 unfavorable variance
B) $2,750 favorable variance
C) $1,500 favorable variance
D) $1,500 unfavorable variance

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

Assuming that the standard fixed overhead rate is based on full capacity, the cost of available but unused productive capacity is indicated by the


A) fixed factory overhead volume variance
B) direct labor time variance
C) direct labor rate variance
D) variable factory overhead controllable variance

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

Volume variance measures the use of fixed factory overhead resources.

A) True
B) False

Correct Answer

verifed

verified

An unfavorable cost variance occurs when budgeted cost at actual volumes exceeds actual cost.

A) True
B) False

Correct Answer

verifed

verified

Nonfinancial performance output measures are used to improve the input measures.

A) True
B) False

Correct Answer

verifed

verified

Standards are set for only direct labor and direct materials.

A) True
B) False

Correct Answer

verifed

verified

The fixed factory overhead controllable variance is


A) $73,250 favorable
B) $73,250 unfavorable
C) $59,400 favorable
D) $59,400 unfavorable

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

An unfavorable fixed factory overhead volume variance may be due to a failure of supervisors to maintain an even flow of work.

A) True
B) False

Correct Answer

verifed

verified

The total factory overhead cost variance is


A) $4,866.75 unfavorable
B) $4,866.75 favorable
C) $8,981.75 favorable
D) $8,981.75 unfavorable

E) C) and D)
F) B) and D)

Correct Answer

verifed

verified

Using the following information, prepare a factory overhead flexible budget for Andover Company where the total factory overhead cost is $75,500 at normal capacity 100%.Include capacity at 75%, 90%, 100%, and 110%.Total variable cost is $6.25 per unit and total fixed costs are $38,000.The information is for month ended August

Correct Answer

verifed

verified

Showing 141 - 160 of 175

Related Exams

Show Answer